Chyn'sarchitecture & design
BUILDING SERVICES (ARC 2423)
Project 2 The Inspiration and The Intervention
My groupmates and I have visited to Subang Parade Shopping Mall as it is the selected case study of our group. We are introduced to the basic principles, process and equipment of various building services systems through this real life project. We are exposed to the integration of various building services systems in a building. After the visit, we are to demonstrate our understanding of building services systems into a report and a summarized presentation board. In this project, we have develop our understanding and familiarity on the drawing conventions and standards for different building services systems.
Our group has performed a thorough study and analysis of the following services systems associated to the building:
i) mechanical ventilation and air-conditioning system,
ii) electrical supply system,
iii) water supply system,
iv) sewerage and sanitary system,
v) mechanical transportation system, and
vi) fire protection system
We have document our findings accordingly.
The slideshow below shows the report which has done by our group:




The presentation board showing the summary of the building services in Subang Parade is shown below:



© 2015 by TictChyn Teh