top of page

BUILDING STRUCTURES (ARC 2523)

Project 1 Fettuccine Truss Bridge

In a group of six, we carried out precedent study of a truss bridge. Using the info we obtain from the precedent study, we have designed and constructed a fettuccine

bridge within the limitations of  600mm clear span and maximum weight of 150g. The bridge is tested to fail. 

 

We are required to do an exercise of calculations of load efficiency individually. And from there we learned how to analyse and evaluate the structural analysis of truss. We have documented a report which consists of the precedent study and detailed report of the constructed fettuccine bridge, And also we have included the detailed structural analysis of the bridge in the report.

 

The constructed fettuccine bridge:

 

The slideshow below shows the analysis report of our group:

© 2015 by TictChyn Teh