top of page
Chyn'sarchitecture & design
PROJECT MANAGEMENT (ARC 3614)
Project 1 Defining & Documenting a Modular Construction Project
In groups of 6-7 students, our task is to design and manage a simple construction project in a way that emphasises either COST, QUALITY or TIME, with a MEASURABLE success criteria.
4 Components in total:
Introduction, Design, Conclusion
Expanded organisational chart (stating HR characteristics), 2 case studies
SWOT Analysis, Success Criteria, Work Breakdown Structure / Gantt Chart
Risk Analysis, Maintenance proposal.
The slideshows below shows the presentation slides that we have done:

Project 1_Page_01.jpg

Project 1_Page_02.jpg

Project 1_Page_76.jpg

Project 1_Page_01.jpg
1/76
© 2015 by TictChyn Teh
bottom of page