Project 1 Alternative Construction Solutions
In a group of 7 members, we have brought along my previous semester’s design project to be discussed among ourselves and our respective tutors in terms of the size and complexity of the project. Next, we should choose and decide on which scheme that we want to work on for this assignment.
Then, at least 50 percent modifications are performed on the original construction systems and to replace with different yet appropriate, more complex or recent building technology, preferably without affecting the plans.
Modifications are carried out on the following building components:
i) Floor system
ii) Wall system
iii) Roof system
iv) To include a new basement level.
Accordingly, a report is produced which documents the precedent study as well as appropriate working drawings and detail drawings of the building.